top of page

PERMIT INFO & FEES

Things to Consider:

 

Setbacks & Building Clearances – Setbacks and building clearances will vary depending on the municipality & zoning of your property.

​

Right-of-Way & Utility Easements  – Structures need to maintain a clearance ranging between 4 ft – 10 ft from any ROW or utility easements on your property.  Check property records, parcel maps, surveys and grant deeds for any potential extant easements on your property. 

​

Water Meter / Service Upgrade – Exceeding a threshold on your total water fixture count (i.e. sinks, toilets, showers, etc.) will require an upgrade to the water meter and service line.  A backflow preventer may be required depending on the increase in demand.

​

Overhead Powerlines / Height of Structure –A two-story structure is typically required to maintain a 10’ clearance from any overhead powerlines.  Please consult with your service provider to check for any potential height constraints. 

​

Coastal Overlay Zone - If your property is located in a Coastal overlay zone it may require approval from the Coastal Commision. 

 

COASTAL OVERLAY ZONE SD.png

City of San Diego General Permit Fees for Structures.  See link below to for full details.  Note other fees may apply.

https://www.sandiego.gov/sites/default/files/dsdib501.pdf

https://www.sandiego.gov/sites/default/files/2019-companion-unit-handbook.pdf

​

School Fees: https://www.sandiego.gov/sites/default/files/dsdib146.pdf

Plan Check & Inspection Fees:  See below

Book a Free Virtual Appointment with a City Planner:  https://www.sandiego.gov/development-services/virtual-appointments

 

fees.jpg

County of San Diego General Permit Fees for Structures.  See link below to for full details. Note other fees may apply.

https://www.sandiegocounty.gov/content/sdc/pds/bldgforms.html#fees

 

fees 2.PNG
2.PNG
3.PNG
4.PNG
5.PNG
bottom of page